Road detours in wisconsin2/25/2023 ![]() If you do have product that has transferred to your vehicle, it is non corrosive and will not damage your vehicle. If caution and reduced speeds are taken when driving on recently treated roadways, the transfer of material from the roadway to your vehicle is unlikely. These agents are environmentally safe and extend the pavements life. The screenings will be swept up in a day or two after the product is applied. When will the road be cleaned up? After the product is applied, an application of limestone screenings will be applied to the road. These markings are not permanent, and will naturally fade within a few weeks. Please be advised that driving onto a driveway before the contractor is finished applying the limestone/sand may cause vehicle tires to track some of the product onto driveways and sidewalks. When can I drive on the road? You can exit your driveway and drive through the work area, but please go slow and stay on the area treated with sand/screenings. Once the road has been treated with lime screenings, the road will be fully opened to traffic. Please obey all signs and crew direction. How long does the process take? Once our small crew begins work on your street, the process will usually only take one to two hours. This penetrating sealer is the most widely used pavement rejuvenator in the market for over 50 years, and will assist in minimizing the need for more costly and disruptive methods of street repair. Reclamite is a product designed to extend the life of the pavement by sealing the pavement from the elements. Why is this product being applied to my road? CAM, LLC will be applying Reclamite Maltene Based Rejuvenating Agent to your roads. If you have a lawn sprinkling system that sprays or drains onto the street pavement you should turn it off for the day in which work will be performed on your street and one day following the treatment. ![]() (This treatment is weather dependent, if the forecast calls for rain, operations will be delayed) No On-Street Parking Monday, Oct 3 rd and Tuesday, Oct 4 th.Ä«etween the hours of 8:00 am until 4:00 pm. ![]() Please be advised that the contractor CAM, LLC is scheduled to do work on these roads starting October 3 rd.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |